Building Flooring Above A Concrete Pad

When building a landing for deck stairs typical codes require the pad to extend beyond the steps about 36 inches behind the steps about 12 inches and on the sides of the steps about 6 inches.
Building flooring above a concrete pad. A typical pad has a 4 inch layer of gravel underneath and about 4 inches of concrete on top. This was the ultimate bad patio. Building a framed wood floor over an existing concrete slab can provide the space needed for electric wiring heat venting plumbing drain lines and added insulation when remodeling a basement or garage space. If you have a concrete slab that is in good shape it is very e.
Originally it was tiled then the tile was chiseled off and the pockmarked surface got a coat of paint. The procedure for installing a floor structure over a slab with 2 by 6 joists can be.